top of page

EV Charging in Auckland Apartments: Getting the Body Corporate to Yes

  • 3 days ago
  • 2 min read

Charging an EV from an apartment car park is completely solvable — but it fails when an owner asks the body corporate for 'a power point by my park' with no plan. What committees approve is a proposal that answers three questions: whose meter pays, what happens when ten owners want the same thing, and who owns the maintenance. Typical per-park installation runs $2,000–$4,500 plus GST depending on distance from the metering room, and shared load-managed systems bring the per-owner cost down as more join.

On the body corp committee — or lobbying one? Call 021 889 770 — we prepare the technical proposal committees can actually vote on.

The three questions every committee asks

  • Who pays for the power? — The clean answer: the charger feeds from YOUR apartment's meter, or carries its own sub-meter. Nobody subsidises anybody; the argument disappears.

  • What about building capacity? — One charger rarely matters; ten do. A load-management plan (chargers share available capacity, slowing at peak) future-proofs the building and is what turns a grudging 'one-off exception' into a policy.

  • Who owns and maintains it? — The owner owns the charger, an agreed electrician standard covers installation, and the CoC sits in the body corp records.

The path that works

Site assessment first: we trace the route from your metering position to your park, measure the run, and check building capacity. You get a written scope with fixed pricing and a one-page technical summary for the committee — metering, load management, standards, insurance. Most committees approve a well-documented first installation and adopt it as the template; being the owner who brought the template usually means being the first one charging.

Frequently asked questions

Can the body corp just say no?

Committees can decline proposals — but a documented, self-metered, load-managed proposal removes every standard objection, and EV-readiness is increasingly an apartment-value question boards take seriously.

Can I just trickle-charge from a car park socket?

Existing common-area sockets are on the body corp's meter — that's everyone else paying for your driving, and buildings shut it down fast. Do it properly once.

What speed of charging is realistic in a car park?

7.4kW where capacity allows; load-managed systems may run slower at peak and full speed overnight — which is when apartment cars charge anyway. Overnight is what matters.

Get the template proposal

EWRB-registered electricians · Certificate of Compliance on every installation · Based in Remuera, servicing the central Auckland 10km ring

bottom of page